{"id":13818,"date":"2025-09-05T15:36:23","date_gmt":"2025-09-05T13:36:23","guid":{"rendered":"https:\/\/boldfactory.it\/?p=13818"},"modified":"2026-03-12T10:36:04","modified_gmt":"2026-03-12T09:36:04","slug":"what-are-the-actual-stages-of-a-perfumery-project","status":"publish","type":"post","link":"https:\/\/boldfactory.it\/en\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/","title":{"rendered":"What are the actual stages of a perfumery project"},"content":{"rendered":"<h2 data-start=\"349\" data-end=\"408\">What really happens, from brief to finished product<\/h2>\n<p data-start=\"410\" data-end=\"565\">When it comes to perfume development, the process is often told in a simplified way:<br data-start=\"510\" data-end=\"513\" \/>idea \u2192 fragrance \u2192 packaging \u2192 production \u2192 sale.<\/p>\n<p data-start=\"567\" data-end=\"693\">In reality, a perfumery project does not work that way.<br data-start=\"622\" data-end=\"625\" \/>Or rather: <strong data-start=\"635\" data-end=\"692\">When it is handled like this, it rarely really works<\/strong>.<\/p>\n<p data-start=\"695\" data-end=\"905\">A sound project is not a linear sequence of activities, but a system of interconnected decisions.<br data-start=\"795\" data-end=\"798\" \/>Understanding the <strong data-start=\"808\" data-end=\"822\">actual stages<\/strong> means to understand <em data-start=\"840\" data-end=\"861\">where value is created<\/em> e <em data-start=\"864\" data-end=\"904\">Where, most often, problems are generated<\/em>.<\/p>\n<h2 data-start=\"912\" data-end=\"967\">1. Clarification of context (even before the brief).<\/h2>\n<p data-start=\"969\" data-end=\"1019\">The first stage is not creative. \u00c8 <strong data-start=\"1003\" data-end=\"1018\">contextual<\/strong>.<\/p>\n<p data-start=\"1021\" data-end=\"1112\">Before talking about fragrance or design, it is necessary to clarify some basic elements:<\/p>\n<ul data-start=\"1113\" data-end=\"1253\">\n<li data-start=\"1113\" data-end=\"1146\">\n<p data-start=\"1115\" data-end=\"1146\">for whom the product is intended<\/p>\n<\/li>\n<li data-start=\"1147\" data-end=\"1169\">\n<p data-start=\"1149\" data-end=\"1169\">where it will be sold<\/p>\n<\/li>\n<li data-start=\"1170\" data-end=\"1209\">\n<p data-start=\"1172\" data-end=\"1209\">At what price it will have to be credible<\/p>\n<\/li>\n<li data-start=\"1210\" data-end=\"1253\">\n<p data-start=\"1212\" data-end=\"1253\">With what initial and prospective volumes<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1255\" data-end=\"1331\">This stage is often skipped or treated superficially. It is a mistake.<\/p>\n<p data-start=\"1333\" data-end=\"1482\">If these parameters are not clear from the beginning, all subsequent steps will be forced to adapt, with costs, compromises and second thoughts.<\/p>\n<h2 data-start=\"1489\" data-end=\"1530\">2. Economic boundary definition<\/h2>\n<p data-start=\"1532\" data-end=\"1648\">Immediately after context comes a crucial and often underestimated stage: <strong data-start=\"1608\" data-end=\"1647\">the economic scope of the project<\/strong>.<\/p>\n<p data-start=\"1650\" data-end=\"1703\">Here we are still not talking about \u201cfinal costs,\u201d but about:<\/p>\n<ul data-start=\"1704\" data-end=\"1810\">\n<li data-start=\"1704\" data-end=\"1735\">\n<p data-start=\"1706\" data-end=\"1735\">sustainable cost range<\/p>\n<\/li>\n<li data-start=\"1736\" data-end=\"1764\">\n<p data-start=\"1738\" data-end=\"1764\">marginality objectives<\/p>\n<\/li>\n<li data-start=\"1765\" data-end=\"1786\">\n<p data-start=\"1767\" data-end=\"1786\">production limits<\/p>\n<\/li>\n<li data-start=\"1787\" data-end=\"1810\">\n<p data-start=\"1789\" data-end=\"1810\">industrial constraints<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1812\" data-end=\"1959\">This phase serves to avoid a very common dynamic: beautiful designs that, once put on paper, <strong data-start=\"1920\" data-end=\"1958\">do not stand economically<\/strong>.<\/p>\n<h2 data-start=\"1966\" data-end=\"2007\">3. Construction of the brief (the real one)<\/h2>\n<p data-start=\"2009\" data-end=\"2055\">Only at this point does it make sense to talk about the brief.<\/p>\n<p data-start=\"2057\" data-end=\"2137\">An effective brief is not an inspirational document. It is an operational tool.<\/p>\n<p data-start=\"2139\" data-end=\"2162\">A good brief contains:<\/p>\n<ul data-start=\"2163\" data-end=\"2300\">\n<li data-start=\"2163\" data-end=\"2203\">\n<p data-start=\"2165\" data-end=\"2203\">clear indications of positioning<\/p>\n<\/li>\n<li data-start=\"2204\" data-end=\"2256\">\n<p data-start=\"2206\" data-end=\"2256\">olfactory references (not ingredient lists)<\/p>\n<\/li>\n<li data-start=\"2257\" data-end=\"2278\">\n<p data-start=\"2259\" data-end=\"2278\">realistic target<\/p>\n<\/li>\n<li data-start=\"2279\" data-end=\"2300\">\n<p data-start=\"2281\" data-end=\"2300\">explicit constraints<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2302\" data-end=\"2411\">When the brief is vague, creativity becomes inefficient. When it is clear, creativity becomes precise.<\/p>\n<h2 data-start=\"2418\" data-end=\"2463\">4. Olfactory development and creative directions<\/h2>\n<p data-start=\"2465\" data-end=\"2528\">This is the best known but not always the most understood phase.<\/p>\n<p data-start=\"2530\" data-end=\"2657\">Olfactory development is not for \u201cchoosing the most beautiful scent.\u201d It is for exploring <strong data-start=\"2618\" data-end=\"2640\">consistent directions<\/strong> With the project.<\/p>\n<p data-start=\"2659\" data-end=\"2690\">Creative avenues are for:<\/p>\n<ul data-start=\"2691\" data-end=\"2790\">\n<li data-start=\"2691\" data-end=\"2723\">\n<p data-start=\"2693\" data-end=\"2723\">testing brand identity<\/p>\n<\/li>\n<li data-start=\"2724\" data-end=\"2753\">\n<p data-start=\"2726\" data-end=\"2753\">understand how far he can go<\/p>\n<\/li>\n<li data-start=\"2754\" data-end=\"2790\">\n<p data-start=\"2756\" data-end=\"2790\">identifying what is not working<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2792\" data-end=\"2864\">Discarding is part of the process. In fact, it is one of the most important parts.<\/p>\n<h2 data-start=\"2871\" data-end=\"2912\">5. Technical validation of the fragrance<\/h2>\n<p data-start=\"2914\" data-end=\"2974\">A chosen fragrance is not yet a manufacturable fragrance.<\/p>\n<p data-start=\"2976\" data-end=\"3023\">This is where aspects that are often invisible come into play:<\/p>\n<ul data-start=\"3024\" data-end=\"3113\">\n<li data-start=\"3024\" data-end=\"3037\">\n<p data-start=\"3026\" data-end=\"3037\">stability<\/p>\n<\/li>\n<li data-start=\"3038\" data-end=\"3069\">\n<p data-start=\"3040\" data-end=\"3069\">compatibility with packaging<\/p>\n<\/li>\n<li data-start=\"3070\" data-end=\"3096\">\n<p data-start=\"3072\" data-end=\"3096\">regulatory compliance<\/p>\n<\/li>\n<li data-start=\"3097\" data-end=\"3113\">\n<p data-start=\"3099\" data-end=\"3113\">repeatability<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3115\" data-end=\"3218\">Skipping or compressing this stage means moving the problems later, when they cost much more.<\/p>\n<h2 data-start=\"3225\" data-end=\"3276\">6. Packaging design (not just design)<\/h2>\n<p data-start=\"3278\" data-end=\"3349\">Packaging is not a \u201clater\u201d stage. It is a phase <strong data-start=\"3333\" data-end=\"3348\">structural<\/strong>.<\/p>\n<p data-start=\"3351\" data-end=\"3381\">At this stage, the following are defined:<\/p>\n<ul data-start=\"3382\" data-end=\"3463\">\n<li data-start=\"3382\" data-end=\"3402\">\n<p data-start=\"3384\" data-end=\"3402\">real components<\/p>\n<\/li>\n<li data-start=\"3403\" data-end=\"3411\">\n<p data-start=\"3405\" data-end=\"3411\">weights<\/p>\n<\/li>\n<li data-start=\"3412\" data-end=\"3425\">\n<p data-start=\"3414\" data-end=\"3425\">materials<\/p>\n<\/li>\n<li data-start=\"3426\" data-end=\"3443\">\n<p data-start=\"3428\" data-end=\"3443\">availability<\/p>\n<\/li>\n<li data-start=\"3444\" data-end=\"3463\">\n<p data-start=\"3446\" data-end=\"3463\">order minimums<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3465\" data-end=\"3503\">Packaging should be consistent with:<\/p>\n<ul data-start=\"3504\" data-end=\"3544\">\n<li data-start=\"3504\" data-end=\"3514\">\n<p data-start=\"3506\" data-end=\"3514\">price<\/p>\n<\/li>\n<li data-start=\"3515\" data-end=\"3525\">\n<p data-start=\"3517\" data-end=\"3525\">channel<\/p>\n<\/li>\n<li data-start=\"3526\" data-end=\"3544\">\n<p data-start=\"3528\" data-end=\"3544\">positioning<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3546\" data-end=\"3630\">Inconsistent packaging does not ruin the project right away. It makes it fragile over time.<\/p>\n<h2 data-start=\"3637\" data-end=\"3675\">7. Industrialization of the project<\/h2>\n<p data-start=\"3677\" data-end=\"3724\">Here the project moves from theory to reality.<\/p>\n<p data-start=\"3726\" data-end=\"3748\">This stage includes:<\/p>\n<ul data-start=\"3749\" data-end=\"3850\">\n<li data-start=\"3749\" data-end=\"3778\">\n<p data-start=\"3751\" data-end=\"3778\">definition of suppliers<\/p>\n<\/li>\n<li data-start=\"3779\" data-end=\"3814\">\n<p data-start=\"3781\" data-end=\"3814\">production planning<\/p>\n<\/li>\n<li data-start=\"3815\" data-end=\"3830\">\n<p data-start=\"3817\" data-end=\"3830\">actual times<\/p>\n<\/li>\n<li data-start=\"3831\" data-end=\"3850\">\n<p data-start=\"3833\" data-end=\"3850\">actual costs<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3852\" data-end=\"3916\">This is the time when many assumptions are confirmed or disproved.<\/p>\n<p data-start=\"3918\" data-end=\"4020\">A well-constructed project gets here with few surprises. A poorly constructed one begins to change shape.<\/p>\n<h2 data-start=\"4027\" data-end=\"4070\">8. Production, filling and packaging<\/h2>\n<p data-start=\"4072\" data-end=\"4129\">This is the most visible stage, but not the most decision-making.<\/p>\n<p data-start=\"4131\" data-end=\"4174\">Here we execute what was decided earlier:<\/p>\n<ul data-start=\"4175\" data-end=\"4237\">\n<li data-start=\"4175\" data-end=\"4205\">\n<p data-start=\"4177\" data-end=\"4205\">fragrance production<\/p>\n<\/li>\n<li data-start=\"4206\" data-end=\"4217\">\n<p data-start=\"4208\" data-end=\"4217\">filling<\/p>\n<\/li>\n<li data-start=\"4218\" data-end=\"4237\">\n<p data-start=\"4220\" data-end=\"4237\">packing<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4239\" data-end=\"4376\">When everything is designed correctly, this phase is smooth. When it is not, delays, rework and unexpected costs emerge.<\/p>\n<h2 data-start=\"4383\" data-end=\"4425\">9. Preparation for launch and rearrangement<\/h2>\n<p data-start=\"4427\" data-end=\"4470\">A project does not end with the first batch.<\/p>\n<p data-start=\"4472\" data-end=\"4530\">One of the most important questions is: <strong data-start=\"4508\" data-end=\"4530\">what happens next?<\/strong><\/p>\n<ul data-start=\"4532\" data-end=\"4636\">\n<li data-start=\"4532\" data-end=\"4579\">\n<p data-start=\"4534\" data-end=\"4579\">Is reordering simpler or more complex?<\/p>\n<\/li>\n<li data-start=\"4580\" data-end=\"4609\">\n<p data-start=\"4582\" data-end=\"4609\">do costs really come down?<\/p>\n<\/li>\n<li data-start=\"4610\" data-end=\"4636\">\n<p data-start=\"4612\" data-end=\"4636\">does the supply chain hold up?<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4638\" data-end=\"4689\">Thinking only about launching is half-hearted planning.<\/p>\n<h2 data-start=\"4696\" data-end=\"4710\">Conclusion<\/h2>\n<p data-start=\"4712\" data-end=\"4841\">A perfumery project is not a sequence of creative steps. It is a system of decisions that must remain consistent over time.<\/p>\n<p data-start=\"4843\" data-end=\"4871\">Who understands the actual stages:<\/p>\n<ul data-start=\"4872\" data-end=\"4948\">\n<li data-start=\"4872\" data-end=\"4893\">\n<p data-start=\"4874\" data-end=\"4893\">reduces errors<\/p>\n<\/li>\n<li data-start=\"4894\" data-end=\"4913\">\n<p data-start=\"4896\" data-end=\"4913\">save time<\/p>\n<\/li>\n<li data-start=\"4914\" data-end=\"4948\">\n<p data-start=\"4916\" data-end=\"4948\">builds stronger projects<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4950\" data-end=\"5012\">Those who ignore them often discover problems when it is too late.<\/p>\n<h3 data-start=\"5019\" data-end=\"5046\">Note Insight Strategy<\/h3>\n<p data-start=\"5047\" data-end=\"5139\">This article is not meant to \u201cteach\u201d perfumery. It serves to <strong data-start=\"5112\" data-end=\"5138\">make it more readable<\/strong>.<\/p>\n<p data-start=\"5141\" data-end=\"5264\">Because the projects that really work are not the most inspired ones, but the ones that are built with greater awareness.<\/p>","protected":false},"excerpt":{"rendered":"<p>Quello che succede davvero, dal brief al prodotto finito Quando si parla di sviluppo di un profumo, il processo viene spesso raccontato in modo semplificato:idea \u2192 fragranza \u2192 packaging \u2192 produzione \u2192 vendita. In realt\u00e0, un progetto di profumeria non funziona cos\u00ec.O meglio: quando viene gestito cos\u00ec, raramente funziona davvero. Un progetto solido non \u00e8 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":13819,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[],"class_list":["post-13818","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articoli"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BOLD: Articoli | Quali sono le fasi reali di un progetto di profumeria<\/title>\n<meta name=\"description\" content=\"Una guida chiara alle vere fasi di un progetto di profumeria, dalle decisioni iniziali all\u2019industrializzazione, oltre le semplificazioni commerciali.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/boldfactory.it\/en\/what-are-the-actual-stages-of-a-perfumery-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BOLD: Articoli | Quali sono le fasi reali di un progetto di profumeria\" \/>\n<meta property=\"og:description\" content=\"Una guida chiara alle vere fasi di un progetto di profumeria, dalle decisioni iniziali all\u2019industrializzazione, oltre le semplificazioni commerciali.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/boldfactory.it\/en\/what-are-the-actual-stages-of-a-perfumery-project\/\" \/>\n<meta property=\"og:site_name\" content=\"BOLD Factory\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-05T13:36:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-12T09:36:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/boldfactory.it\/wp-content\/uploads\/2026\/02\/components.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"665\" \/>\n\t<meta property=\"og:image:height\" content=\"665\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"BFactory\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/boldfactory.it\/wp-content\/uploads\/2026\/02\/bold-quali-sono-le-fasi-reali-di-un-progetto-di-profumeria-open-graph.jpg?last_updated=1770302192\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"BFactory\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/\"},\"author\":{\"name\":\"BFactory\",\"@id\":\"https:\\\/\\\/boldfactory.it\\\/en\\\/#\\\/schema\\\/person\\\/24fbe09241931011470ce093dcd4626a\"},\"headline\":\"Quali sono le fasi reali di un progetto di profumeria\",\"datePublished\":\"2025-09-05T13:36:23+00:00\",\"dateModified\":\"2026-03-12T09:36:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/\"},\"wordCount\":659,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/boldfactory.it\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/components.webp\",\"articleSection\":[\"Articoli\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/boldfactory.it\\\/en\\\/wp-json\\\/wp\\\/v2\\\/posts\\\/13818\\\/#webpage\",\"url\":\"https:\\\/\\\/boldfactory.it\\\/en\\\/wp-json\\\/wp\\\/v2\\\/posts\\\/13818\\\/\",\"name\":\"BOLD: Articoli | Quali sono le fasi reali di un progetto di profumeria\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/boldfactory.it\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/boldfactory.it\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/components.webp\",\"datePublished\":\"2025-09-05T13:36:23+00:00\",\"dateModified\":\"2026-03-12T09:36:04+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/boldfactory.it\\\/en\\\/#\\\/schema\\\/person\\\/24fbe09241931011470ce093dcd4626a\"},\"description\":\"Una guida chiara alle vere fasi di un progetto di profumeria, dalle decisioni iniziali all\u2019industrializzazione, oltre le semplificazioni commerciali.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/#primaryimage\",\"url\":\"https:\\\/\\\/boldfactory.it\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/components.webp\",\"contentUrl\":\"https:\\\/\\\/boldfactory.it\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/components.webp\",\"width\":665,\"height\":665,\"caption\":\"Collezione di flaconi di profumo e cosmetici con tappi neri su tavolo \u2014 BOLD Factory\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/boldfactory.it\\\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/boldfactory.it\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Quali sono le fasi reali di un progetto di profumeria\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/boldfactory.it\\\/#website\",\"url\":\"https:\\\/\\\/boldfactory.it\\\/\",\"name\":\"BOLD Factory\",\"description\":\"Produzione Profumi Private Label Full Service e Conto Terzi\",\"alternateName\":\"BOLD\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/boldfactory.it\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"it-IT\",\"publisher\":{\"@id\":\"https:\\\/\\\/boldfactory.it\\\/#organization\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/boldfactory.it\\\/en\\\/#\\\/schema\\\/person\\\/24fbe09241931011470ce093dcd4626a\",\"name\":\"BFactory\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2796e6199d0203c7306274110d696886c0eae4712ddb31ad4b042d2aa969a266?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2796e6199d0203c7306274110d696886c0eae4712ddb31ad4b042d2aa969a266?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2796e6199d0203c7306274110d696886c0eae4712ddb31ad4b042d2aa969a266?s=96&d=mm&r=g\",\"caption\":\"BFactory\"},\"sameAs\":[\"http:\\\/\\\/boldfactory.it\"],\"url\":\"https:\\\/\\\/boldfactory.it\\\/en\\\/author\\\/bfactory\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BOLD: Articles | What are the actual stages of a perfumery project.","description":"A clear guide to the real phases of a perfumery project, from early decisions to industrialization, beyond commercial simplifications.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/boldfactory.it\/en\/what-are-the-actual-stages-of-a-perfumery-project\/","og_locale":"en_US","og_type":"article","og_title":"BOLD: Articoli | Quali sono le fasi reali di un progetto di profumeria","og_description":"Una guida chiara alle vere fasi di un progetto di profumeria, dalle decisioni iniziali all\u2019industrializzazione, oltre le semplificazioni commerciali.","og_url":"https:\/\/boldfactory.it\/en\/what-are-the-actual-stages-of-a-perfumery-project\/","og_site_name":"BOLD Factory","article_published_time":"2025-09-05T13:36:23+00:00","article_modified_time":"2026-03-12T09:36:04+00:00","og_image":[{"width":665,"height":665,"url":"https:\/\/boldfactory.it\/wp-content\/uploads\/2026\/02\/components.webp","type":"image\/webp"}],"author":"BFactory","twitter_card":"summary_large_image","twitter_image":"https:\/\/boldfactory.it\/wp-content\/uploads\/2026\/02\/bold-quali-sono-le-fasi-reali-di-un-progetto-di-profumeria-open-graph.jpg?last_updated=1770302192","twitter_misc":{"Written by":"BFactory","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/#article","isPartOf":{"@id":"https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/"},"author":{"name":"BFactory","@id":"https:\/\/boldfactory.it\/en\/#\/schema\/person\/24fbe09241931011470ce093dcd4626a"},"headline":"Quali sono le fasi reali di un progetto di profumeria","datePublished":"2025-09-05T13:36:23+00:00","dateModified":"2026-03-12T09:36:04+00:00","mainEntityOfPage":{"@id":"https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/"},"wordCount":659,"commentCount":0,"image":{"@id":"https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/#primaryimage"},"thumbnailUrl":"https:\/\/boldfactory.it\/wp-content\/uploads\/2026\/02\/components.webp","articleSection":["Articoli"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/posts\/13818\/#webpage","url":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/posts\/13818\/","name":"BOLD: Articles | What are the actual stages of a perfumery project.","isPartOf":{"@id":"https:\/\/boldfactory.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/#primaryimage"},"image":{"@id":"https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/#primaryimage"},"thumbnailUrl":"https:\/\/boldfactory.it\/wp-content\/uploads\/2026\/02\/components.webp","datePublished":"2025-09-05T13:36:23+00:00","dateModified":"2026-03-12T09:36:04+00:00","author":{"@id":"https:\/\/boldfactory.it\/en\/#\/schema\/person\/24fbe09241931011470ce093dcd4626a"},"description":"A clear guide to the real phases of a perfumery project, from early decisions to industrialization, beyond commercial simplifications.","breadcrumb":{"@id":"https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/#primaryimage","url":"https:\/\/boldfactory.it\/wp-content\/uploads\/2026\/02\/components.webp","contentUrl":"https:\/\/boldfactory.it\/wp-content\/uploads\/2026\/02\/components.webp","width":665,"height":665,"caption":"Collezione di flaconi di profumo e cosmetici con tappi neri su tavolo \u2014 BOLD Factory"},{"@type":"BreadcrumbList","@id":"https:\/\/boldfactory.it\/quali-sono-le-fasi-reali-di-un-progetto-di-profumeria\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/boldfactory.it\/"},{"@type":"ListItem","position":2,"name":"Quali sono le fasi reali di un progetto di profumeria"}]},{"@type":"WebSite","@id":"https:\/\/boldfactory.it\/#website","url":"https:\/\/boldfactory.it\/","name":"BOLD Factory","description":"Private Label Perfume Manufacturing &amp; Development, Full Service &amp; Contract","alternateName":"BOLD","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/boldfactory.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"it-IT","publisher":{"@id":"https:\/\/boldfactory.it\/#organization"}},{"@type":"Person","@id":"https:\/\/boldfactory.it\/en\/#\/schema\/person\/24fbe09241931011470ce093dcd4626a","name":"BFactory","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/2796e6199d0203c7306274110d696886c0eae4712ddb31ad4b042d2aa969a266?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/2796e6199d0203c7306274110d696886c0eae4712ddb31ad4b042d2aa969a266?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2796e6199d0203c7306274110d696886c0eae4712ddb31ad4b042d2aa969a266?s=96&d=mm&r=g","caption":"BFactory"},"sameAs":["http:\/\/boldfactory.it"],"url":"https:\/\/boldfactory.it\/en\/author\/bfactory\/"}]}},"_links":{"self":[{"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/posts\/13818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/comments?post=13818"}],"version-history":[{"count":1,"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/posts\/13818\/revisions"}],"predecessor-version":[{"id":13820,"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/posts\/13818\/revisions\/13820"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/media\/13819"}],"wp:attachment":[{"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/media?parent=13818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/categories?post=13818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/boldfactory.it\/en\/wp-json\/wp\/v2\/tags?post=13818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}